
Authers: Alireza Bakhtar- Mahni Kooshavar"Implementation of UCA Based Inter and Intra Substation"
Unpublished Manuscript/ Conference Paper | Gender/Automation | 2005 Year | PDF | 86 kb | 9 Pages
Modern electric power systems have been called "The largest human made machine" because they are physically large, literally thousands of miles, which are operating in precise synchronism.
The paper provides a concise explanation of the automation and supervisory Control and data acquisition (SCADA) requirements in grace of maturing next generation microprocessor based IEDs, which is found crucial, by the Azerbaijan Power Engineering Consultancy (MONA) Company for the substations in Iran.
